Lines Matching defs:Top
352 // Top-Level entry points for the schedule() driver...
399 // liveness during bottom-up scheduling. Top-down scheduling may proceed but
490 // Top-Level entry points for the schedule() driver...
499 /// the Top RP tracker in case the region beginning has changed.
943 GenericSchedulerBase(C), Top(SchedBoundary::TopQID, "TopQ"),
970 Top.releaseNode(SU, SU->TopReadyCycle, false);
990 SchedBoundary Top;
993 /// Candidate last picked from Top boundary.
1025 SchedBoundary Top;
1030 GenericSchedulerBase(C), Top(SchedBoundary::TopQID, "TopQ") {}
1058 Top.releaseNode(SU, SU->TopReadyCycle, false);